| SDH (Equipment) Series
3 SMA-1 to SMA-4C+ Upgrade and Operation |
Overview
The SDH 3-day equipment course is based upon hands-on and theoretical
learning. Each module is designed to be self-standing and builds
upon existing modules within the programme. Designed to teach how
to upgrade the SMA Hardware.
Duration - 3 Day.
|
| Who will benefit |
Anyone who comes into contact with or works within the SDH arena
at all levels, especially on Upgrades.
|
| Prerequisites |
None required but a knowledge of SMA-1 would be an advantage (SMA-1
Second Line Maintainence Course).
|
| Course Assesments |
By the end of the course delegates will be able to describe and
carry out hands on work on:
SMA-1 Hardware
Hardware Description
Composition Rules
Upgrade procedures & Operation on Upgraded Hardware
|
| |
| Course
Content |
SMA-1 Detailed Equipment Overview
Introduction
General Equipment Information
SMA-1
SMA-1 Upgrades (SMA-4c and 4c+)
Hardware description
Composition Rules
SMA-1/4c Tributary Card Equipping Rules
SMA-1/4c 1.5/2 Mb/s Tributary Cards Only
SMA-1/4c 1: N Protected Tributary Cards
Plug In Units (Traffic Carrying Cards)
STM-1 unit
STM-1 Electrical And 140Mb/s Unit
34Mb/s, 45Mb/s, 2Mb/s and 1.5Mb/s Units
34Mb/s VCAM (Virtual Container Access
Module)
The P-Switch (or SDH Combiner)
Plug-in Units (Non-Traffic carrying Cards)
Communications Card
Auxiliary Card
Mux Controller Card
Equipment Configuration Types
Cross Connection Types
Synchronisation
Synchronisation Modes
Timing configurations
Selection and Allocation of Timing Sources
Synchronisation Status Message Byte (SSMB)
Fast SSMB Operation
Synchronisation Reversion Mechanism
Local Craft Terminal Operation
Creation and Deletion of Cards
Creating a Unit
Deleting a Unit
Network Configuration
Protection Options
PSU Protection
Switch Card Protection
STM-1 Multiplex Section Protection - 1 + 1 MSP
Tributary Card Protection
Tributary Port Protection
VC-n Ring Protection (SNCP)
 |
SMA-1 to SMA-4c+ Upgrade Course
Introduction
Upgrade Records
Static Sensitive Warning
Enhancement Procedure
Limitations
Outline Enhancement Procedure
Requirements For Upgrade
Test Equipment
Upgrade Units
Pre-Enhancement Procedure
Technical Assistance
Precautions
Preparation
Pre-Enhancement EM-OS Activities
Network Backup Data
Trail Management
Clear Configuration Discrepancy Alarms (EM-OS R3.1.1 and Later)
Delete Sections
De-configure Synchronisation Sources
Preliminary Checks On Enhancement Units
Visual Inspection
Build Level Check
Card Link & Switch Settings
Line Section Enhancement Procedure
Preliminary Checks
Fit Additional PSU
Replace Switch Card
1+1 MSP Line Protection
Upgrade Stm-1 Line Interfaces
Reconfigure Stm-4 Frame Structure
Reconfigure Synchronisation Sources
Comms Routeing Tables
Post Line Section Enhancement Checks
Post Enhancement ES-OS Activities
Update EM-OS Data
Trail Management
Post Enhancement Network Checks
Recovery Procedure
|