| SDH (Equipment) Series
3 SMA-4 to SMA-16C Upgrade and Operation |
Overview
The SDH 3-day equipment course is based upon hands-on and theoretical
learning. Each module is designed to be self-standing and builds
upon existing modules within the programme. Designed to teach how
to upgrade the SMA Hardware.
Duration - 3 Day.
|
| Who will benefit |
Anyone who comes into contact with or works within the SDH arena
at all levels, especially on Upgrades.
|
| Prerequisites |
None required but a knowledge of SMA-16 would be an advantage (SMA-4
& or 16 Second Line Maint Cse) .
|
| Course Objectives |
By the end of the course delegates will be able to describe and
carry out hands on work on:
SMA-16 Hardware
Hardware Description & Composition Rules
Upgrade procedures & Operation on Upgraded Hardware
|
| |
| Course
Content |
SMA-16 Detailed Equipment Overview
Introduction
General Equipment Information
SMA-16
Hardware Description
Composition Rules
High Band Tributaries
SMA-16 Protected Tributary Cards
Plug In Units (Traffic Carrying Cards)
STM-16 Optical Unit
STM-4 Unit
STM-1 Unit
STM-1 Electrical And 140Mb/s Unit
34Mb/s, 45Mb/s, 2Mb/s and 1.5Mb/s Units
34Mb/s VCAM (Virtual Container
Access Module)
The P-Switch (or SDH Combiner)
SMA-16 Switch Cards (Figure 22)
Plug-in Units (Non-Traffic carrying Cards)
Communications Card
Auxiliary Card
Mux Controller Card
Equipment Configuration Types
Cross Connection Types
Synchronisation
Synchronisation Modes
Timing configurations
Selection and Allocation of Timing Sources
Synchronisation Status Message Byte (SSMB)
Fast SSMB Operation
Synchronisation Reversion Mechanism
Local Craft Terminal Operation
Creation and Deletion of Cards
Creating a Unit
Deleting a Unit
Network Configuration
Protection Options
PSU Protection
Switch Plane Protection
STM-16 Multiplex Section Protection - 1 + 1 MSP
Tributary Card Protection
Tributary Port Protection
VC-n Ring Protection (SNCP)
MS-SPRING Protection
 |
Series 3 SMA-16c to SMA-16c+ Upgrade
Introduction
Enhancement Record
Static Sensitive Warning
Upgrade Procedure
Limitations
Outline of Enhancement Procedure
Requirements for Upgrade
Pre-Enhancement Procedure
Technical Assistance
Precautions
Preparation
Trail Management
Removal of Trails
Delete Sections
Build Level Check Of Upgrade Units
Visual Inspection Of Upgrade Units
Card Link Settings Of Upgrade Units
NE Upgrade Using EM-OS And LCT
Load Software Files Into Em-Os
Preparations For Upgrade
Upgrade NE
NE Upgrade Using LCT Only
Transfer Download Data To "C" Drive
Preparations For Switch Unit Upgrade
Empty SMC Partitions for SMA-4/SMA-16c Switch
Set NE Off-Line/Back-Up Configuration/Decommission
Upgrade NE
Fallback Procedure
Post Enhancement EM-OS Activities
Update EM-OS Data
Trail Management
 |